- Standardsignatur17574BU
- TitelISSW2018 - General Topic: Protection measures: Risk management and engineering solutions
- MaterialArtikel aus einem Buch
- Datensatznummer200204772
- QuelleISSW2018: international snow science workshop: a merging of theory and practice - Proceedings ; 02 (2018)
- AbstractO2.1 Wind transport scenarios based on the slope aspect for avalanche risk management purposes; Eloïse Bovet, Luca Pitet, Igor Torlai, Valerio Segor, Paola Dellavedova, Umberto Pellegrini; O2.2 Rezoning after installing avalanche mitigation measures: case study of the Vallascia avalanche in Airolo, Switzerland; Stefan Margreth; O2.3 Investigating avalanche interaction with defence structures using unmanned aerial system photogrammetry; Marc Adams, Jan-Thomas Fischer, Andreas Kofler, Christian Tollinger, Johannes Hoffmann; O2.5 Application of Non-Linear Fracture Process Zone Model to Avalanche Initiation and Implications for Field Tests; Thomas Boone; O2.6 Effectiveness of avalanche protection structures in run-out zones: the Taconnaz avalanche path case in France; Mohamed Naaim, Thierry Faug, Florence Naaim-Bouvet, Nicolas Eckert; P2.1 Transportation Avalanche Research Pooled Fund Program ; John Stimberis, Jim Kennedy, Rob Bickor, Jamie Yount, Bill Nalli, Brian Gorsage,Dave Hamre, Ethan Greene, Kevin Thompson; P2.2 Braking mounds in avalanche simulations – a SamosAT case study; Andreas Kofler, Christian Tollinger, Annegret Jenner, Matthias Granig, Marc Adams; P2.3 Monitoring forces in steel wire rope nets: Evaluation of short and long term influences; Engelbert Gleirscher, Andreas Kofler, Thomas Gigele, Armin Graf, Matthias Granig,Jan-Thomas Fischer; P2.5 Everyday work of an avalanche engineer – Calculation of avalanche loads and protection of small objects in avalanche paths like ropeway towers; Benno Hofer, Lukas Schroll, Daniel Illmer; P2.6 Research on sudden visibility impairment associated with gaps in snow fences; Masaru Koda, Yoshikazu Ito, Hidechika Ueno, Hiroshi Ota ; P2.7 Avalanche Breaker in Eastern Tyrol ; Hanspeter Pussnig ; P2.8 Comparing two methods of artificial avalanche triggering: gas vs. Solid explosives; Stephan Simioni, Jürg Schweizer; P2.9 Fast versus slow avalanche impact dynamics: insights from measurements at Lautaret pass avalanche test-site, France; Jonathan Hugueny, Hervé Bellot, Thierry Faug, Emmanuel Thibert, Xavier Ravanat,Frédéric Ousset, Firmin Fontaine, Florence Naaim-Bouvet ; P2.10 Protection of high mountain huts against avalanche hazard: a case study at Pavé lake, French Alps; Thierry Faug, Nicolas Eckert, Mohamed Naaim; P2.11 Evaluation of an infrasound detection system for avalanches in Rogers Pass,Canada; Jordy Hendrikx, Lisa Dreier, Giacomo Ulivieri, Jamie Sanderson, Alan Jones, Walter Steinkogler; P2.12 Changes in Snow Pressure on Snow Bridges in the Hokkaido Region of Japan; Wataru Takahashi, Yusuke Harada, Joji Takahashi, Masaru Matsuzawa; P2.14 How reliable are design avalanche loads? A systematic approach to estimate their uncertainty.Mark Schaer, Katharina Fischer, Stefan Margreth; P2.15 Relation between the Growth Management of Trees in Highway Snowbreak Woods and their Snowbreak Effectiveness; Hiroshi Ota, Masaru Koda, Yoshikazu Ito, HIdechika Ueno; P2.16 Effects of Tree Height on Snowpack Instability in the North Shore Mountains of Vancouver, BC Canada; Zachary Wentz; P2.17 Active and passive avalanche protection structures. Development of protection systems in 40 years of snows and avalanches; Massimo Raviglione, Friedrich Mair, Michela Barberis; P2.18 Design and Construction of an Avalanche Deflection Berm, Mount Kitchener Avalanche Path, Aoraki Mount Cook National Park, NewZealand; Alan Jones, Donald Bogie; P2.19 The Challenges of Mitigation Measures in Longyearbyen Svalbard; Arni Jonsson, Ørjan Nerland, Stian Bue Kanstad, Øyvind Skeie Hellum, Einar John Lande; P2.20 Glacier hazards in the canton of Valais, Switzerland: observation and categorization of 80 dangerous glaciers; Martin Proksch, Evelyn Zenklusen Mutter, André Burkard, Pascal Stoebener, Martin Funk, Damian Steffen
- SchlagwörterSchutzmaßnahme, Risikomanagement, Wind, Photogrammetrie, Run-Out-Zone, Lawinensimulation, Lawinendruck, Bodentemperatur
Hierarchie-Browser